DEPTRAMOD Start a project
An AdeptraMod container data center module on its pad at dusk

Modular data center design and build

Data centers,built as modules.

AI-ready and enterprise data centers in containers and prefabricated steel halls, from 100 kW to 1 MW of IT load.

IT load
100 kW to 1 MW
Built forms
Container, steel prefab
Workloads
AI and enterprise
Scope
Design and build

What we do

One discipline, done completely: the design and build of modular data centers.

100kWSmallest
IT load
1MWLargest
IT load
2Built forms
container, steel

Two built forms

A container,
or a steel hall.

A container data center module being lowered onto its pad by crane
01 / CONTAINER

The data hall that arrives by truck.

Racks, cooling and power distribution fitted inside an ISO-format steel container, then set on a prepared pad and connected.

An AdeptraMod prefabricated steel data center hall with external chillers
02 / STEEL PREFAB

The hall that goes up in bays.

Portal frames and insulated panels assembled around a full-size white space, with contained aisles and external cooling plant.

Design and build

From the factory floor
to energized.

One team carries the project from the brief to handover. Most of the work happens off site, so the site itself stays short and clean.

A container module being fitted out with racks in a fabrication hall
01

Fabricate

Modules are fitted out and steel halls prefabricated while the pad is prepared.

02

Deliver

Shipped, lifted and set in place.

03

Connect

Power and cooling plant tied in to the modules.

04

Energize

Tested under load and handed over with its documentation.

Build-out

One module,
step by step.

From a bare pad to a sealed, energized data hall. Each system goes in on top of the last: floor, racks, cooling, power, then fire protection.

Build-out stage of an AdeptraMod container data center, shown in cutaway
01 / 08Foundation

Concrete pad cast, with anchor plates and service stub-ups set for the module.

Configure

Set the load.
Watch it assemble.

Pick an IT load, a rack density and a built form. Containers are added one by one as the load grows. The site below rebuilds to match and plays the sequence from bare pad to energized.

400kW
100 KW1 MW
Rack density
Per rack. 30 kW is dense GPU inference territory.
Built form
Built form
Container
IT modules
2
Racks
14
Cooling approach
Rear-door or in-row

Indicative only. Final sizing is set during design.

The 3D model needs WebGL, which this browser has switched off.
05 / 05Energized
Indicative layout

Look inside

Turn the model.
Then open it.

The 3D model needs WebGL, which this browser has switched off.
Drag to rotate

Container module

A data hall inside an ISO-format steel container. Up to eight racks in a row with a CDU rack at each end, plus power distribution, fitted as one unit, shipped by road or sea, and set on a prepared pad.

Suits
Loads at the lower end of the range, phased growth, constrained or temporary sites.
Scales by
Adding modules side by side on the same pad.
On site
Placement, power and cooling connection, commissioning.
Power, hot aisleCooling, cold aisle

Workloads

AI-ready and enterprise,
from one platform.

Cold aisle of a high-density data hall with liquid-cooled racks
AI-ready

High-density halls for GPU clusters.

Planned around heavy power per rack and the liquid cooling that goes with it, ready for accelerated compute on the day it is energized.

  • DensityHigh kW per rack, fewer racks per megawatt
  • CoolingLiquid to the rack or to the chip
  • LayoutShort power paths, plant close to the load
Enterprise

Conventional halls for business systems.

For private cloud, storage and line-of-business systems at standard densities, laid out for maintainability and for adding capacity in steps.

  • DensityStandard kW per rack, more racks per megawatt
  • CoolingAir with aisle containment
  • LayoutService access and room to grow

Start a project

Tell us the load
and the site.

Fill in what you know. Sending opens your email app with the brief addressed to Mod@adeptra.ai.